Arthur J Update
Salvage work has been completed for the 38 foot tug Madison. The tug has been salvaged and removed from the scene. Work continues with the salvage of the 110 foot long dredge Arthur J. Salvage crews pumped the remaining fuel and oil from the dredge. The crews proceeded to pump air into the tanks and plan to refloat the vessel soon after.
Related articles
- Oil sheen spotted on Lake Huron during barge salvage (foxnews.com)
- Crews Make Progress Toward Recovering Sunken Barge (detroit.cbslocal.com)
- Fuel spill in Lake Huron caused by sunken dredge, capsized tugboat (minbcnews.com)